Issue EICs, EICRs, and Minor Works certificates — plus recurring landlord testing schedules and client recall when EICRs, emergency lighting, or fire alarms are due.
Electrical certificates is for electricians and electrical contractors who need proper BS 7671 completion paperwork — not a generic safety file.
Create an installation (the premises), add consumer units and circuit schedules, enter test results circuit by circuit, record EICR observations, and issue branded PDF certificates. Part P notification records sit alongside so notifiable work is tracked to submission.
Set recurring testing obligations per installation — landlord EICRs every five years, emergency lighting and fire alarm tests on your cycle. When a test is coming up, email the client automatically with a booking link so they can book you back in. Issuing an EICR rolls the next due date from the certificate.
EIC for new work, EICR for condition reports, MEIWC for minor works — each with the fields you expect: supply characteristics, extent and limitations, declarations, and a schedule of test results tied to your board layout.
EICR with observations and test schedule The friction: Condition reports need coded observations and per-circuit test readings — not a PDF upload slot. How the app helps: C1/C2/C3/FI observations, board schedules, and Zs, IR, and RCD results on one certificate.
Landlord EICR recall The friction: Five-year EICRs slip — landlords forget until the letting agent chases. How the app helps: Due dates on each installation; clients get reminder emails with a link to book the visit.
Emergency lighting and fire alarm cycles The friction: Periodic testing contracts are tracked in spreadsheets, not tied to the premises. How the app helps: Separate obligations per installation with their own intervals and client recall.
Minor works without retyping the board The friction: Small jobs still need a proper MEIWC and test evidence. How the app helps: Reuse the installation board layout and record tests on the circuits you changed.
Part P traceability The friction: Notifiable work gets done but the notification reference is lost. How the app helps: Part P register linked to installations and certificates with status from pending to acknowledged.
1. Add the installation Premises address, client, and premises type — the root for boards and certificates.
2. Build board schedules Consumer units, circuits, protective devices, and maximum Zs values.
3. Test, observe, issue Enter results, add EICR observations if needed, then issue a numbered PDF certificate.
4. Keep clients on cycle Set testing obligations and let recall emails prompt landlords to book the next visit.
No app here is ever finished. If Electrical certificates doesn't fit what you need, tell us. Gaps like that usually ship within the hour, included in the subscription.